Some progress on the railroad with the fascia installed.
Saturday, September 24, 2011
Fascia for the Railroad
Saturday, August 27, 2011
Building a swing gate with bridges.
It's been an interesting year and I realized this is my first post in quite some time. With Karen's mom passing away very unexpectedly in February most of my railroad time was used in trips to AZ with family business.
But I have managed to get some work done on the layout this year all be it time consuming on building a swing gate for access into the train room without having to duck under the section of track in front of the door.
Saturday, January 22, 2011
Helping Out on the Unita Railroad
I made a trip to my friend Bryan Daniel's model railroad the Unita RR. Bryan and his friend Bob have made a huge amount of progress this past year. It was fun to see the scenery taking shape and all the work they have done since the last time I was there about three months a go.
Friday, December 24, 2010
Out with the new and in with the old
Ever have one of those moments when you just realize that no matter what, things are not going to work the way you had hoped? Well, after getting this little railroad to the point of operating some trains it was obvious that my big spiral helix was not going to work. It was just to big for the room to allow for comfortable fit of people to operate trains. So I have removed the new helix base and installed the old one that I had originally installed. This has opened up the room very much and has made for a comfortable space to have operators as well as access to tracks and sidings to allow for operation.
Thursday, November 18, 2010
The loop is complete
This is the other end of the turnout control the under side of the lay out. The music wire is the main driver of the throw bar for the switch points. The spring ensures a full return when the knob is turned back to the main position. The read and Black wires are the main bus and track feeders that run all around the lay out to supply the voltage to the track.
Friday, October 15, 2010
Trip to Feather River Canyon
Karen and I went to Feather River Canyon today for some fall colors. But we were about one to two weeks early as there was not any trees turning yet. We did enjoy one of the most scenic drives we have ever had. It was fun to follow the railroad as it cuts through solid rock tunnels and steal bridges. Past hydro electric stations and old mining and lumber camps this is one of the most amazing displays of engineering around. It took 9 years for the railroad to go 70 miles in 1937 at a cost of $100K/mile in 1937 dollars. I can't even imagine what it would cost in todays dollars. We ended up in Quincy and had pizza for lunch then toured the town a bit and visited the museum. One can't visit a town without going into the drug store. And one of the treats was some pumpkin fudge. Now it's not what you think it is down right delicious so we just had to buy some.
What does this all have to do with model railroading you may ask? Well a good model railroader will spend time doing research to find out how to model the prototype. I have been wanting to make this trip for several months to see the bridges and especially the steal truss Y bridge at Keddie. So all in al it was a fun day and we are planing a trip to see the fall colors as soon as we can.
Thursday, October 7, 2010
Hand made turnouts take 2
After my first attempt to assemble turnouts I decided to give PC board ties a try. I went to Fry's electronics and bought two PC boards and cut my own ties and assembled my first turnout using this method.
This is my home made cutting table for cutting out the PC board ties. I just used some old drawer slides for the table and mounted my Dremel tool and used a cutoff blade to cut each tie at 1/10th of an inch wide then cut them to length with a wire cutters.
Subscribe to:
Posts (Atom)