The new benchwork is installed and almost complete. It is 48" from the floor with a shelf 19" above the main level which will be where the railroad will be. I have installed vinyl flooring as a backdrop that I will paint with scenery. The lighting is rope light that is going to provide light for operations when the layout is completed
The sub layer is 1/2" plywood that will be covered with 1" blue foam. The background is vinyl flooring mounted with the back facing outward for painting.
Here you can see the vinyl flooring as it is clamped as the glue dries.
The background will be painted blue and have scenery painted to give depth to the scene. The white line in the backdrop is where the vinyl is spliced. I have used vinyl spackling to fill in the seam and it's sanded and ready for painting.
The shelf is 22" deep and will be covered by blue foam which can be shaped for scenery. The white line is the vinyl spackling that needs to be sanded.
There will be a valance around the top that will hide the rope light and finish off the shelf.
One of the reasons for redoing the layout was to allow for the desk I use as a workbench to be in the same room as the layout. This allows for working on locomotives as well as rolling stock and building structures for the layout in a climate controlled room.
No comments:
Post a Comment