Ever have one of those moments when you just realize that no matter what, things are not going to work the way you had hoped? Well, after getting this little railroad to the point of operating some trains it was obvious that my big spiral helix was not going to work. It was just to big for the room to allow for comfortable fit of people to operate trains. So I have removed the new helix base and installed the old one that I had originally installed. This has opened up the room very much and has made for a comfortable space to have operators as well as access to tracks and sidings to allow for operation.
HO model railroad set in my minds eye of scenery I'v seen over my lifetime. The main operation of the railroad will be based on the Verde Tunnel and Smelter Railroad in my home town of Clarkdale AZ.
No comments:
Post a Comment